I2 Rally project feature request and fix
Posted: Mon Nov 30, 2020 9:32 am
Good day,
I have been using the rally project for engineering development and it is always been a bit difficult to create a stage, since we don't have any beacon and driving randomly to the track.
I think that using the datum cursors (yellow and green lines) to create the start and end of a stage would be a nice addition to rally project. Something like "Use secondary datum for stage length" check box in the "Insert Stage" menu.
Also each time Channel Report is used in a Rally Project the following error is shown:
Missing mandatory Header(s): "Outings:Stages"
As I understand the error is cause by the default setting in Channel Report Proprieties been set at Outing:Laps in the Headings Options Menu
Cheers!
Frank
I have been using the rally project for engineering development and it is always been a bit difficult to create a stage, since we don't have any beacon and driving randomly to the track.
I think that using the datum cursors (yellow and green lines) to create the start and end of a stage would be a nice addition to rally project. Something like "Use secondary datum for stage length" check box in the "Insert Stage" menu.
Also each time Channel Report is used in a Rally Project the following error is shown:
Missing mandatory Header(s): "Outings:Stages"
As I understand the error is cause by the default setting in Channel Report Proprieties been set at Outing:Laps in the Headings Options Menu
Cheers!
Frank